期刊文献+

斜拉桥索塔海工混凝土配比设计与研究 被引量:2

Design and study on marine concrete mix ratio in tower of cable-stayed bridge
下载PDF
导出
摘要 目前高性能海工混凝土配合比设计还没有统一的方法。应用正交配合比设计,论述了杭州湾大桥北航道桥索塔高性能海工混凝土的设计原则、方法和过程,确定了满足施工要求的海工混凝土配合比,并就试验结果进行分析,提出了影响海工混凝土性能的因素。 High-performance marine concrete mix ratio design has no unified approach at present.Discussion is made on design principle, method and procedure of high performance marine concrete of northern route bridge cable tower of Hangzhou Bay Bridge by orthogonal mix ratio design,and determines the mix ratio of marine concrete which can meet the construction requirements.Analysis is also made on the test results, and factors affect the performance of marine concrete are put forward.
出处 《新型建筑材料》 北大核心 2007年第11期46-48,共3页 New Building Materials
关键词 杭州湾大桥 海工混凝土 配合比设计 试验研究 Hangzhou Bay Bridge: marine concrete: mix design experimental study
  • 相关文献

参考文献2

  • 1杭州湾大桥工程指挥部.杭州湾跨海大桥专用施工技术规范[S].2005.
  • 2蔡正咏 王足献.正交设计在混凝土中的应用[M].北京:中国建筑工业出版社,1985..

共引文献36

同被引文献4

  • 1汪溯.湛江海湾大桥索塔液压自爬模施工技术[J].公路,2006,51(11):62-65. 被引量:6
  • 2JTJ275-2000海港工程混凝土结构防腐蚀技术规范.[S]北京:人民交通出版社,2000.
  • 3[4]JTJ 041-2000,公路桥涵施工技术规范[S].
  • 4[3]杭州湾跨海大桥指挥部.杭州湾跨海大桥专用施工技术规范[Z].北京:人民交通出版社,2005.

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部