摘要
从设计、招投标、项目实施和竣工结算四个阶段探讨了工程建设中工程造价的控制,主要分析了项目实施阶段控制造价存在的问题,并提出了相应的解决措施,从而有效控制工程造价。
From design, bidding, execution and finishing settlement stages, it discusses on how to control project cost during construction, and mainly analyzes the problems existed in controlling project cost. It also brings forward relative solving measures, so as to control the project cost effectively.
出处
《山西建筑》
2007年第35期290-291,共2页
Shanxi Architecture
关键词
工程造价
施工方案
招投标
施工阶段
project cost, constructing plan, bidding, constructing stage