期刊文献+

配电系统故障处理自动化技术综述 被引量:24

Summary of Automation Technology for Fault Handling in Distribution System
下载PDF
导出
摘要 配电系统故障处理是一个系统过程。文中介绍了一些新的方案和方法,如网络式保护技术、分布式智能技术、故障点自动定位技术,给配电系统故障处理自动化提出了新的思路。重点介绍了基于故障指示器技术的单相接地故障的检测和定位方法。 Fault handling in distribution system is a systematic course. The paper introduced some new schemes and methods, such as network type protection, distributed intelligence, fault automatic location, which put forward the new train of thought for automation technolog, of fault handling in distnqaution system. The detection and location method of single - phase grounding fault based on fault indicator technology was introduced.
作者 袁钦成
出处 《电力设备》 2007年第12期1-5,共5页 Electrical Equipment
关键词 故障处理 网络式保护 分布式智能 故障指示器 接地故障检测 故障自动定位 配电系统 fault handling network type protection distributed intelligence fault indicator grounding fault detection fault automaticlocation distribution system
  • 相关文献

参考文献8

  • 1袁钦成,张忠华,吴传宏.集中控制与分布式智能相结合的故障后网络重构方案[J].电力设备,2001(3):41-44. 被引量:5
  • 2袁钦成.配电自动化及管理系统的工程实践[J].电力设备,2004,5(1):11-16. 被引量:5
  • 3[8]Yuan Qincheng,Zeng Yan,Wu Yuxiao.A novel scheme for automatic loop -reconfiguration following a fault[C].POWERCON'98 1998 International Conference on Power System Technology Proceedings,August,Vol.1:18-21,1998 Beijing,China.
  • 4[9]Yuan Qincheng,Zhang Zhonghua,He Chunxia.Study and implementation of a novel scheme for fault isolation and restoration in distribution system[C].CICED 2000,China International Conference on Electricity Distribution in 2000 Conference Proceeding,Shanghai,China,October:17-20,2000.
  • 5[10]Yuan Qincheng,Zhou Shiyue,Bao Hongqi,et al.Practice for the distribution automation and distribution management system in China.Regional Symposium on "Electricity distribution reforms-issues and challenges in the New Millennium" the Malaysian National Committee of CIRED (MNC CIRED),August,2002,Kuala Lumpur,Malaysia:5-8.
  • 6[11]Yuan Qincheng.Detection of single phase eearthed faults in the overhead lines of neutral floating distribution systems[C].FEISEAP Regional Workshop on PURAL ELECTRIFICATION,Sep.,1993,Beijing,China:14-17.
  • 7[12]Final Report of The CIRED Working Group WG03.Fault management in electrical distribution systems[C].International Conference on Electricity Distribution,December 1998.
  • 8[13]Yuan Qincheng,Wang Tianhua,He Chunxia.Research and implementation of an automated fault locating system for distribution system[C].CICED 2000,China International Conference on Electricity Distribution in 2000 Conference Proceeding,October,2000,Shanghai,China:17-20.

二级参考文献4

  • 1[1]Yuan Qincheng, Zhang Zhonghua, He Chunxia. Study and Implementation of a Novel Scheme for Fault Isolation and Restoration in Distribution System. CICED 2000, China International Conference on Electricity Distribution in 2000 conference Proceeding, 2000,October: 17 ~ 20.
  • 2[1]Everett Atwell, Tex Gamvrelis, David Kearns, Robert Landman. Automated Distribution System Restores Power in less than 60 Seconds. '96 Distributech Conference Proceedings, Tampa, Florida. Jan. 15~18,1996
  • 3[2]Brian J, James P G, Ali Khorramshali, Ralph Young. The Implementation of Baltimore Gas & Electric's Distribution Automation System-Case Study. '97 Distributech Conference Proceedings, San Diego, California. Jan. 27~30,1997
  • 4[3]Yuan Qincheng, Zhang Zhonghua, He Chunxia. Study and Imple mentation of a Novel Scheme for Fault Isolation and Restoration in Distribution System. CICED 2000, China International Conference on Electricity Distribution in 2000 Conference Proceeding, Shanghai, China. October 17~20, 2000

共引文献7

同被引文献141

引证文献24

二级引证文献113

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部