摘要
结合具体工程实例,进行了基坑涌水量和降水井数量的计算,对降水井的井位布置进行了介绍,探讨了地铁明挖法施工中降水施工的过程,得出了该施工方案效果较好的结论,具有一定的参考价值。
Combined with the concrete project example, it calculates the inflow of base pit and dropping water well number, introduces the dropping water well position, discusses the dropping water construction process in the open dredging process to the underground, and gets the conclusion of this construction having good effectiveness which have some reference values.
出处
《山西建筑》
2008年第5期198-199,共2页
Shanxi Architecture
关键词
地铣
降水施工
降水井
施工工艺
underground, dropping water construction, dropping water well, construction technology