期刊文献+

一种适合变形监测的单频单历元算法 被引量:3

A Single Epoch Algorithm for Deformation Monitoring Using Single Frequency GPS Receivers
下载PDF
导出
摘要 基于吉洪诺夫正则化理论,研究了一种适合变形监测的单频单历元算法。首先,分析了单频单历元相位双差观测方程法矩阵的特性;然后,基于吉洪诺夫正则化方法,将秩亏的法方程由秩亏变为满秩,可以得到模糊度的浮动解及其相应的均方误差矩阵,结合LAMBDA方法可准确地固定模糊度,得到基线向量的单历元解。最后,通过一个3km长的基线算例说明该算法的有效性和实用性。 Based on Tikhonov regularization, a new single epoch algorithm suitable for deformation monitoring using single frequency GPS receivers is proposed. Firstly, the characteristic of the normal matrix for double difference carrier phase measurements is analyzed. Then, Tikhonov regularizer is used to transform the normal matrix from rank-deficient to the full rank to obtain float ambiguity solutions and their mean squared error matrix (MSEM) , which is then used to accurately fix the ambiguities in combination with LAMBDA method so as to find the single epoch solution of the baseline. Finally, the effective and practicability of the proposed algorithm is demonstrated by a case of an over 3 km long baseline.
出处 《金属矿山》 CAS 北大核心 2008年第2期83-86,共4页 Metal Mine
基金 山东省基础地理信息与数字化技术重点实验室开放基金项目(编号:SD060815)
关键词 单历元算法 变形监测 单频 LAMBDA方法 均方误差矩阵 正则化方法 基线向量 双差观测 GPS, Deformation monitoring, Single epoch algorithm using single frequency GPS receivers
  • 相关文献

参考文献15

二级参考文献19

  • 1韩绍伟.GPS快速定位理论及数值结果[J].武汉测绘科技大学学报,1994,19(2):136-142. 被引量:7
  • 2徐绍铨 李征航.隔河岩在坝外观变形GPS自动化监测系统的建立[J].武汉测绘科技大学学报,1998,23:1-4.
  • 3陈永奇,Proceedings of KIS’97,1997年,301页
  • 4陈永奇,Proceedings of the 64th FIG PC Meeting and International Symposium,1997年,84页
  • 5陈永奇,武汉测绘科技大学学报,1997年,4期,343页
  • 6陈永奇,ZfV,1994年,2期,96页
  • 7徐绍铨,武汉测绘科技大学学报,1998年,23卷,增刊,1页
  • 8Zheng D W,Statistica Sin,1992年,2卷,2期,605页
  • 9过静--,工程勘察,1997年,3期,48页
  • 10Dragert H,Geomatica,1995年,49卷,3期,301页

共引文献205

同被引文献39

  • 1欧吉坤.测量平差中不适定问题解的统一表达与选权拟合法[J].测绘学报,2004,33(4):283-288. 被引量:95
  • 2唐卫明,孙红星,刘经南.附有基线长度约束的单频数据单历元LAMBDA方法整周模糊度确定[J].武汉大学学报(信息科学版),2005,30(5):444-446. 被引量:66
  • 3刘小生,罗任秀.边坡工程变形监测系统的研究[J].金属矿山,2005,34(7):45-47. 被引量:7
  • 4Ashkenazi V, Dodson A H, Moore T, et al. Real time OTF GPS monitoring of the humber bridge[J]. Survey World, 1996(4) :25-32.
  • 5Leroy E. GPS real time leveling on the world longest suspension bridge[J]. GIM, 1995,9(8):6-8.
  • 6Hofmann-Wellenhof B, Lichtenegger H, Collins J. Global positioning system, theory and practice[M]. 4 th ed. New York: Springer Wien,1997.
  • 7Collier P A. Kinematic GPS for deformation moni- toring[J]. Geomatics, 1997,51(2): 157-168.
  • 8Corbett S J, Cross P A. GPS single epoch ambiguity resolution[J]. Survey Review, 1995,33 (257): 149- 160.
  • 9Tikhonov A N, Arsenin V Y. Solutions of ill-posed problems[M]. New York: Wiley, 1977.
  • 10Teunissen P J G . The Least-squares ambiguity decorrelation adjustment: a method for fast GPS in- teger ambiguity estimation[J]. Journal of Geodesy, 1995, 70(1-2) :65-82.

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部