This paper discusses the designing and implementing of MPS(Master Production Schedule)and CRP(Capacity Requirement Plan)Simulation System of MRPⅡ. by means of Visual Simulation Tool VAT,using enterprise manufacturing data of Resources Management System RMS,the system can afford effective means to simulate,balance and optimize MPS and CRP.