介绍了外高桥电厂3号主变的事故情况,对故障的暂态过程及事故的成因作了全面论述和分析。
An acident occurred in Weigaoqiao Power Plant′s No.3 main tranformer is described and the coarse of the failure and its cause are fully explained and analysed.