基于爆破拆除工程实践,提出了按照工程项目的施工成本构成控制项目成本的方法。同时认为,爆破拆除工程项目的成本管理仅局限于对工程项目的工、料、机的管理与控制是不够的。为达到理想效果,爆破拆除项目的成本控制应该采取事前控制、事中调控、事后总结改进的全过程成本管理办法。对项目成本控制过程应该注意的有关问题提出了看法。
Based on the practice of blasting demolition projects, the methods are given to control the main cost components,which make up the total project cost. At the same time,it is emphasized that the cost control of blasting demolition projects does not only limit in the control of the labor,material and machinery cost used in the projects. In order to obtain the ideal cost-control result,the project cost control should be carried out throughout the whole procedure of the project operation, which includes ex ante cost-analysis, procedure cost-control and ex post evaluation stage. At last, the opinions are delivered related to the matters which should be seriously noticed in the project cost- control.