期刊文献+

中小跨径斜拉桥索力优化的“二阶段法” 被引量:2

"Two Stage Method" of Cable Tension Optimization for Short/Medium Span Cable-Stayed Bridges
下载PDF
导出
摘要 以影响矩阵理论为基础,以有约束优化法及正装分析法为核心,提出中小跨径斜拉桥索力优化"二阶段法",并结合算例加以验证.该方法省去倒装分析过程,可以快速求出合理成桥与施工索力,对中小跨径斜拉桥成桥及施工阶段分析的索力优化计算具有实用意义。 Based on the theory of Influence Matrix, with the constraint optimization and the positive disposition analyses as its core, the "Two Stage Method" which is used for the cable tension optimization on short or medium span cable-stayed bridges is proposed. And then, an example is used to verify the correctness of this method. It can get the reasonable cable tensions without inverse analysis. This method can accelerate the solution procedure of cable tension optimization and it would be Useful in the analysis of both the finished dead state and construction stage in short / medium span cable-stayed bridges,
出处 《重庆交通大学学报(自然科学版)》 CAS 2008年第2期181-184,共4页 Journal of Chongqing Jiaotong University(Natural Science)
关键词 二阶段法 中小跨径 斜拉桥 可变形初拉力 索力优化 Two Stage Method short / medium span cable-stayed bridge variable form of cable tension cable tension optimization
  • 相关文献

参考文献4

二级参考文献24

  • 1杜国华,姜林.斜拉桥的合理索力及其施工张拉力[J].桥梁建设,1989,19(3):11-17. 被引量:85
  • 2王勋文,辛学忠,潘家英,程庆国.确定PC斜拉桥合理恒载索力方法的探讨[J].桥梁建设,1996,26(4):1-5. 被引量:10
  • 3秦顺全 林国雄.斜拉桥安装计算--倒拆法与无应力状态控制法评述.中国土木工程学会桥梁及结构工程学会第九届年会论文集[M].上海:同济大学出版社,1992.569-573.
  • 4颜东煌 田仲初 等.桥梁施工仿真计算程序设计方法.公路工程计算机应用论文集[M].湖南:湖南科学技术出版社,1996.298-302.
  • 5肖汝诚,1996年
  • 6郭文复,1994年斜拉桥国际学术讨论会论文集,1995年,532页
  • 7陆楸,中国公路学报,1990年,1期,1页
  • 8杜国华,桥梁建设,1989年,3期,18页
  • 9陈德伟,同济大学学报,1998年,2期,120页
  • 10颜东煌,公路工程计算机应用论文集,1996年,298页

共引文献316

同被引文献17

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部