期刊文献+

武汉天兴洲公铁两用长江大桥移动模架拆除施工技术 被引量:5

Construction Techniques for Dismantling of Movable Shuttering Form Used for Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge
下载PDF
导出
摘要 武汉天兴洲公铁两用长江大桥正桥I标段0-022号宽墩铁路筒支箱梁采用40m下行式移动模架施工。介绍该下行式移动模架包括前导梁、前导梁平联、后导梁、底模及主梁等的拆除施工方法。 The simply-supported railway box girders on wide piers No. 0-022 of Contract I of the Main Bridge, Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge were constructed by the 40 m long under-deck movable shuttering form. In this paper, the construction methods for dismantling of the shuttering form, including the parts of the front launching nose, lateral bracing system of the launching nose, rear launching nose, bottom form and main truss, are described.
作者 林世发 周文
出处 《桥梁建设》 EI CSCD 北大核心 2008年第2期5-8,共4页 Bridge Construction
关键词 铁路桥 简支梁 下行式移动模架 拆除 施工方法 railway bridge simply-supported girder under-deck movable shuttering form dismantling construction method
  • 相关文献

二级参考文献1

共引文献11

同被引文献16

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部