期刊文献+

三峡工程二期上游横向围堰主要工程地质问题及处理建议

Major geological issues of TGP stage Ⅱupstream transverse cofferdam and treatment suggestions
下载PDF
导出
摘要 三峡工程二期上游围堰轴线的选择经过近20年的研究与勘察,所选定的围堰轴线避开了对防渗墙施工难度大的架空块球体区,及河床深槽地段。通过对围堰堰基的地形地貌及河床冲淤变化、地层岩性、断层构造、岩体风化、岩体透水性分析,提出了解决堰基对防渗墙造孔影响等问题的建议。 The selection of TGP Stage Ⅱ transverse cofferdam axis has been investigated for 20 years. The selected axis is kept away from porous block stone zone and deep river trough area which are difficult to build seepage proof wall. Through analyses with regard to the foundation topography, the scouring and silting variation of the river bed, the rock strata characteristics, the fault structure, the weathering characteristics and water permeability of rock mass, the suggestions to the drilling for seepage proof wall and so on are put forward.
作者 冯彦勋
出处 《人民长江》 北大核心 1997年第6期2-4,共3页 Yangtze River
关键词 围堰 防渗 区域工程地质 水利枢纽 Upstream cofferdam Leakproof cofferdam Regional engineering geology Sanxia Multipurpose Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部