塔山煤矿综放工作面设备配套及巷道尺寸确定 被引量:6

Equipment Coordination of Full-mechanized Caving Mining Face and Confirmation of Roadway Dimension in Tashan Colliery
下载PDF
导出
摘要 通过对综放工作面采煤机、刮板输送机和液压支架的合理配套,确定了巷道和切眼的尺寸,实现了工作面月产1.0Mt高产高效的要求,为今后国内高产高效工作面设备配套与巷道、切眼尺寸的确定提供借鉴。 Dimensions of roadway and open-off cut were confirmed with reasonable equipment coordination of coal cutter, scraper and hydraulic supports in full-mechanized caving mining face. High production of 1.0 Mt and high effect of mining face were realized, which provided reference for equipment coordination of mining face with high production and high effect and dimension confirmation of open-off cut.
作者 孟二存
出处 《煤矿开采》 2008年第3期67-68,共2页 Coal Mining Technology
关键词 设备配套 巷道 切眼 equipment coordination roadway open-off cut