摘要
邻近地铁深基坑施工将导致隧道位移,甚至影响到运营安全。通过对某深基坑施工监测结果得出在各阶段施工过程中,必须及时进行支撑和隧道位称特点的监测,提出若干结论及建议。
Construction of foundation pit influences the adjacent tunnel, and further the safty of metro operation. Through the discuss of excavation way and tunnel displacment, character of tunnel displacment is analysed and several conclusions are obtained.
出处
《上海地质》
2008年第2期27-29,34,共4页
关键词
地铁
基坑
时空效应
metro foundation pit time - space effect