在力控Forcecontrol平台上进行二次开发,建立了黄金矿山生产调度模拟系统,监控模拟矿山各主要生产环节与主要设备状态。介绍了系统总体结构和硬件,以及系统软件等系统主要组成部分。该系统已在矿山成功应用4年多,取得了满意的效果。
A production scheduling simulation system for gold mine was built by second development based on Force control software platform. This system can monitor and simulate the key links of production and the state of key equipments. In this paper, the system framework, the main parts of hardware and software of the production scheduling simulation system are introduced, The system has been put into application successfully, and satisfied effects are obtained.