14行集中回风井突然发生大面积垮塌后,主斜坡道1150~1000m段出现严重风流反向,1000m运输水平新鲜风流无法进入。为此,金川二矿区采用多机并联空气幕引射风流,主斜坡道进风量达到45m^3/s,有效地控制了主斜坡道1150~1000m段的反风现象,解决了1000m运输水平没有新鲜风流的问题。
In Jingchuan's No. 2 Mining District, after the 14 line concentrate ventilation shaft collapsed suddenly, serious reverse airflow occurred between the 1150 - 1000 m main ramp, and fresh airflow could not flow into 1000m haulage level. Therefore, the measure of air flow ejected from air curtain by paralleled fans has been introduced, the velocity of fresh airflow through the main ramp is up to 45 m3/s, the reversal of ventilation airflow between the 1150 - 1000 m main ramp is avoided availably, and the problem that fresh airflow can not come into 1000 m haulage level also is solved.
出处
《矿业研究与开发》
CAS
北大核心
2008年第3期59-61,共3页
Mining Research and Development
关键词
空气幕
矿井通风
引射风流
风流反向
Air curtain, Mine ventilation, Ejected air flow, Reversal of ventilation airflow