长广矿区六矿井筒与工业广场煤柱开采设计与实践 被引量:8

Mining Design for Shaft and Industry Square Pillar and Practice in No.6 Coal Mine in Changguang Mining District
下载PDF
导出
摘要 长广矿区六矿井筒与工业广场煤柱是矿井生产后期的惟一可供开采的资源,讨论了该矿复杂地质条件下井筒与工业广场煤柱开采的可行性;采用分阶段对称跳采方法,制定了开采方案,煤柱设计采出率69%.分析了煤柱开采地表移动与井筒变形实测资料.实践和观测表明,该矿煤柱开采取得了良好的效果,可为类似条件矿井的工广煤柱开采提供借鉴. Shaft coal-pillar as well as mine plant coal-pillar is the only mineable resources in later stage of No. 6 coal mine of Changguang mining district. Aiming at this situation, we discussed, in this paper, the possibility of the pillar mining under complicated geological conditions, proposed the mining method of symmetric jumping extraction by stages, and made the extraction plan suitable for actual situation of the coal mine, which results in a pillar recovery ratio of as high as 69%. In addition, we also analyzed the measured data of ground movement and deformation induced by the extraction of coal-pillar. The practice of extraction shaft coalpillar as well as mine plant coal-pillar shows that this method is successful and can be used as a reference for coal mines with similar conditions.
出处 《采矿与安全工程学报》 EI 北大核心 2008年第2期202-206,共5页 Journal of Mining & Safety Engineering
基金 国家自然科学基金重大项目(50490273)
关键词 井筒与工业广场煤柱 开采方案设计 深部开采 shaft and industry square pillar design of mining scheme deep mining
  • 相关文献

参考文献1

  • 1[1]吕泰和.井筒与工业广场煤柱开采[M].北京:煤炭工业出版社,1995:1-3.

同被引文献58

引证文献8

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部