摘要
位于上海浦东陆家嘴的某工程在基坑开挖过程中必然会对已运营的轨道交通2号线产生影响,对此影响进行了详细的分析;同时,对桩基沉降可能造成隧道的位移进行了计算,并与实测值进行了比对。
Detailed analysis is made to the effect of excavation of the project in Pudong Lujiazui area on the nearby Rail Transit Line 2 in operation.The possible tunnel displacement caused by settlement of pile foundation is calculated and compared with the actual data.
出处
《地下工程与隧道》
2008年第2期13-15,22,共4页
Underground Engineering and Tunnels