滑模工艺在高桥墩施工中的应用 被引量:5

Application on Slip-form Technology in High Pier Construction
下载PDF
导出
摘要 滑模工艺采用埋入钢管作为爬杆支承,液压千斤顶产生外力克服滑升时的摩擦力、模架自重和施工荷载,将成型模架体分阶段连续提升,达到混凝土连续浇注,直至高桥墩混凝土墩身成型。与传统施工方法相比,节约施工机械设备、工期、劳动力、模板及周转材料等,效果良好。 Buried steel pipes are adopted as the climbing pole's supporting in the slip-form. The external force produced by hydraulic jack is used to overcome slipping friction, formwork weight and construction loads. Formed scaffolds are lifted continually step by step to pour concrete resulting in making high pier formed. Comparing with traditional construction methods, the slip-form technology can save construction equipments, time, labor, formwork, scaffold and so on, and the effect is good.
出处 《施工技术》 CAS 北大核心 2008年第6期46-48,共3页 Construction Technology
关键词 滑模 高桥墩 施工技术 slip-form high pier construction technology
  • 相关文献

参考文献5

  • 1朱慈勉.结构力学[M].北京:高等教育出版社,2006.
  • 2张耀春.钢结构设计原理[M].北京:高等教育出版社,2006.
  • 3姚玲森.桥梁工程[M].北京:人民交通出版社,2002..
  • 4谭波.高层建筑液压滑模施工技术[J].中国科技信息,2005(12C):199-199. 被引量:14
  • 5张若美.混凝土结构施工[M].北京:高等教育出版社,2006.

二级参考文献1

共引文献45

同被引文献28

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部