摘要
通过对高填路堤的下沉现象进行研究,主要从设计和施工两方面分析了高填路堤下沉的原因,指出了必须结合工程实际情况采取不同的处理方法,并介绍了几种主要的高填路堤下沉的防治措施。
On research of the high-filled embankment sinking, the article gives the reason for high-filled embankment sinking in design and construction, pointing out that we should adopt the different method according to the actual engineering condition, and introduced several main kinds of measurement for high-filled embankment sinking pretreatment.
出处
《山西建筑》
2008年第20期280-281,共2页
Shanxi Architecture
关键词
高填路堤
下沉原因
防治措施
high-filled embankment, sinking reason, pretreatment measurement