钢管混凝土拱桥拱肋施工应力分析 被引量:2

Stress Analysis of Arch Rib of Concrete-filled-steel Tube Arch Bridge on Construction
下载PDF
导出
摘要 利用"APDL语言编程"建立拱桥施工过程中9个工况的实体有限元模型,并利用该模型分析施工过程中拱肋应力的变化规律,结果表明:拱肋下表面应力值均大于上表面应力值;两侧拱脚及L/4与3L/4的应力变化呈对称趋势;张拉系梁钢束N5时,拱脚附近应力达到最大值,L/4、3L/4和拱顶应力最大值出现在桥面系施工结束后。 Nine 3-D finite element models of arch bridge were established with the APDL languag in current software, the force situations of the arch bridge under construction were analyzed with those above models. The results showed that the stress of under arch-rib contrasted is larger than the up arch-rib, and the stress of arch-foot as well as L/4, 3L/4 of the arch-rib exhibits symmetrical characteristics, and in addition, the Stress of arch foot reaches maximum when pre-stressed steel N5 is strained, while the Stress of L/4 and 3L/4 arch-rib reaches maximum when the construction is completed.
出处 《科学技术与工程》 2008年第14期4022-4026,共5页 Science Technology and Engineering
关键词 钢管混凝土拱桥 实体模型 施工 拱肋 应力 CFST arch bridge 3D model construction arch rib stress
  • 相关文献

参考文献7

二级参考文献26

  • 1陈宝春.钢管混凝土拱桥设计与施工[M].北京:人民交通出版社,1996..
  • 2李国豪.桥梁结构稳定与震动[M].北京:中国铁道出版社,1996..
  • 3赵雷 卜一之.丫髻沙大桥施工阶段稳定性分析的路径效应.第13届全国桥梁学术会议论文集[M].上海:同济大学出版社,1998.698-702.
  • 4杨永清.钢管混凝土拱桥横向稳定性研究.西南交通大学博士学位论文[M].,1998.2.
  • 5杨永清.钢管混凝土拱桥横向稳定性研究[D].成都:西南交通大学,1996.16-17.
  • 6韩林海.钢管混凝土力学[M].北京:科学出版社,2000.107-108.
  • 7SADAO KOMATSU, TATSURO SAKIMOTO. Ultimate load-carrying capacity of steel arches[J]. Journal of the Structural Division, 1988, 103 (12): 2323-2336.
  • 8华孝良,西安公路交通大学学报,1995年,增1期
  • 9Chan S L,J Struct Eng ASCE,1994年,120卷,6期
  • 10胡大琳,理论与应用力学学报,1988年,1期

共引文献158

同被引文献16

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部