乌鞘岭隧道大台深竖井千枚岩地层钻爆设计及施工 被引量:3

"Drill and Blast" Design and Construction of Deep Vertical Shaft in Phyllite Ground: Case Study on Datai Vertical Shaft of Wushaoling Tunnel
下载PDF
导出
摘要 针对乌鞘岭隧道大台竖井在井身掘进过程中遇到的爆破进尺不佳难题,通过对爆破器材、孔眼深度及掏槽方式进行比选,得出了一套在千枚岩地层进行竖井掘进时的深孔爆破参数,并取得了显著成效,使得爆破进尺由原来的1.8~2.2 m提高到3.2~3.8m,确保了大台竖井成井工期目标。 In the initial sinking stage of Datai vertical shaft, the blasting advance rate is not satisfactory. A set of deephole blasting parameters for deep vertical shaft sinking is obtained by optimization of the blasting agents, shothole lengths and cut manners. The optimized blasting parameters are applied in the shaft sinking and satisfactory results are achieved. The blasting advance rate is increased from the original 1.8 - 2.2 m to 3.2 - 3.8 m and the target completion date of Datai vertical shaft is guaranteed.
作者 翟学东
出处 《隧道建设》 2008年第2期205-208,共4页 Tunnel Construction
关键词 深竖井 千枚岩 深孔爆破 直眼掏槽 deep vertical shaft, phyllite deep-hole blasting straight-hole cut
  • 相关文献

参考文献3

二级参考文献1

  • 1[1]龙志阳.立井井筒施工技术.北京:煤炭工业出版社,1999

共引文献4

同被引文献9

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部