乌鞘岭隧道大台竖井井筒衬砌安全快速施工 被引量:3

Safe and Rapid Lining Construction of Datai Vertical Shaft of Wushaoling Tunnel
下载PDF
导出
摘要 介绍了乌鞘岭大台竖井井筒衬砌施工工艺与流程,详细说明了深竖井井筒衬砌时混凝土输送管路的组成,以及垂直落差超过500m输送过程中出现的管路磨损、混凝土堵管及离析等现象所产生的原因及过程,并给出了预防措施及解决办法,同时强调通过严格的施工管理保证深竖井安全快速施工。 The construction techniques and procedures of the lining of Datai vertical shaft of Wushaoling tunnel are presented in the paper. The composition of the concrete delivery pipes for the lining construction of the deep shaft is described in detail. The processes of the pipeline wearing, pipeline blockage and concrete segregation that occur during the over 500 m vertical delivery of the concrete are described, analysis is made on the causes of the accidents and prevention and treatment measures are proposed. It is emphasized that the safe and rapid construction of the vertical shaft can only be achieved by means of strict construction management.
作者 翟学东
出处 《隧道建设》 2008年第3期339-343,348,共6页 Tunnel Construction
关键词 乌鞘岭隧道 深竖井 井筒衬砌 施工工艺 安全快速施工 wushaoling tunnel deep vertical shaft shaft lining construction technology safe and rapid construction
  • 相关文献

参考文献3

二级参考文献2

  • 1[1]龙志阳.立井井筒施工技术.北京:煤炭工业出版社,1999
  • 2[1]中华人民共和国铁道部.TB10203-2002铁路桥涵施工技术规范[S].北京:中国铁道出版社,2002.

共引文献4

同被引文献34

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部