摘要
随着近年来我省沿海滩涂围垦开发工程逐步展开,需要建设大量的隔堤、道路工程,土石方填筑量巨大。为了拓展筑堤材料使用范围,福清东壁岛垦区建设过程中,就地取材利用垦区内海泥砂进行筑堤61.78公里,节省投资约1000余万元;工期提前一年,又使周边环境不因陆地取土受到破坏,取得了良好的经济效益和环保效益。值得同类工程参考借鉴。
Launched gradually along with the recent years our province coast shallow seas and tidelands cultivation development engineering, needed to construct the massive partition embankments, the road engineering, the cubic meter of earth and stone reclamation quantity is huge. In order to develop the embanking material use scope, in the Fuqing Dong Bi island reclamation area construction process, makes use of local materials using the reclamation area inland sea silt carries on builds an embankment 61.78 kilometers, saves the investment approximately ten millon Yuan; A time limit for a project ahead of time year, because also causes the peripheral environment the land not to take the earth to receive the destruction, has obtained the good economic efficiency and the environmental protection benefit. Is worth the similar project reference model.
出处
《福建建筑》
2008年第2期43-45,50,共4页
Fujian Architecture & Construction
关键词
海泥
筑堤
施工技术
sea silt embank construction technology