期刊文献+

南方电网500kW直流融冰装置样机的研制和试验 被引量:31

Development and Test of 500 kW DC De-Icer in China Southern Power Grid
下载PDF
导出
摘要 介绍了南方电网500kW直流融冰装置的研制情况。装置以南方电网直流融冰技术方案为依据,设计、生产了包括整流器和无功补偿器的直流融冰装置。装置的整流器柜和谐波无功补偿柜安装于固定在车辆上的集装箱内。该装置通过了在工厂内整流器的单独试验、整流器和谐波无功补偿器联调试验和低压大电流试验,表明500kW直流融冰装置技术方案是可行和有效的。 The research and development of 500 kW DC de-icer for China Southern Power Grid (CSG) is introduced. Based on the DC de-icing technology in CSG, the de-icer is designed and developed. It consists of a converter and a reactive power compensator which are installed in a steel container fixed on a truck for a convenient transportation purpose. Factory tests are car- ried out, including separate test of the converter, cooperation tests of converter and harmonic reactive power compensator, and low voltage high current test. The result of tests shows the technology of DC de-icer is feasible and effective.
出处 《南方电网技术》 2008年第4期32-36,共5页 Southern Power System Technology
关键词 直流融冰装置 工厂试验 低压大电流试验 DC de-icer factory test low voltage and highcurrent test
  • 相关文献

参考文献3

二级参考文献2

  • 1浙江大学发电教研组直流输电科研组.直流输电[M]电力工业出版社,1982.
  • 2B.H.亚历山德罗夫,B.A.阿莫萨夫,н.E.戈卢勤科夫,P.M.鲁达科娃,许蔚.巴什基尔电网防治覆冰研究[J].电力安全技术,1999,0(1):14-16. 被引量:4

共引文献175

同被引文献231

引证文献31

二级引证文献263

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...