摘要
云南大红山铁矿一期400万t/a地下开采及选矿、管道工程,大红山铜矿一、二期工程均已投产,技术水平及建设效果都很好。阐述了在大红山矿区的设计和建设中,通过工艺创新,设备创新,充分体现了现代矿业:资源利用最大化、参数大型化、设备大型化、运输连续化、控制自动化、环境友好化等特点的突出之处和取得的主要成果。
Yunan Dahongshan Iron Mine 1 st phase 4 million t/a project composed of underground mining, mineral processing and piping engineering and Dahongshan Copper Mine 1 st and 2nd Phase Projects have all been put into operation with very good technical level and construction results. Presently, both mines are under the design and construction for a capacity expansion. By the end of the Eleventh Five - Year Plan period, the total capacity of the mining area will reach 1. 8million t/a. The paper describes the design and construction of Dahongshan mining area, the modern mining that is fully embodied through technological innovation and equipment innovation and the efforts and main achievements in realizing the maximization of the resource utilization, upsizing of the parameters and equipment, continuous transport and control auto- mation and being friendly to environment.
出处
《金属矿山》
CAS
北大核心
2008年第8期1-4,105,共5页
Metal Mine
关键词
大红山
矿区
开发
先进
创新
发展
和谐
Dahongshan, Ore field, Exploitation, Advanced, Innovation, Development, Harmonous