期刊文献+

南京大胜关长江大桥主桥4号墩双壁钢吊箱围堰整体吊装设计与施工 被引量:11

Design and Construction of Integral Lifting and Installation of Double-Wall Steel Boxed Cofferdam for Main Pier No.4 of Dashengguan Changjiang River Bridge in Nanjing
下载PDF
导出
摘要 南京大胜关长江大桥主桥4号墩基础施工采用先平台后围堰的方法。介绍该墩855t双壁钢吊箱围堰在岸上整体制造、气囊法下水、浮运至墩位、采用大型水上浮吊进行整体吊装的施工技术。 The construction of the foundation {or Pier No, 4 of the main bridge of Dashengguan Changjiang River Bridge in Nanjing was implemented by way of installing the working plat-form first and the cofferdam late. This paper presents the construction techniques for the integral fabrication of the 855 t double-wall steel boxed cofferdam on land for the pier foundation, launching of the cofferdam down to river by the air bag method, floating of the cofferdam to pier site and integral lifting and installation of the cofferdam to position by large capacity floating crane.
作者 程晨
出处 《桥梁建设》 EI CSCD 北大核心 2008年第4期20-23,共4页 Bridge Construction
关键词 桥梁基础 吊箱围堰 施工方法 bridge foundation boxed cofferdam construction method
  • 相关文献

同被引文献64

引证文献11

二级引证文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部