摘要
从泵站规划、水泵、电动机及辅助设备、进、出水建筑物、变电所及输电线路等方面对陕西省东雷一期抽黄、宝鸡峡、交口等8处大型泵站工程分析,提出陕西省大型泵站工程现状存在的主要问题,为陕西省大型泵站工程更新改造规划提供必要的改造思路。
From the aspects of pumping station programming, water pump, electromotor and its auxiliary equipments, intake structure and water-conveyance structure, transformer substation, and transmiting electricity line, 8 large pumping station pro- jects, such as Donglei first stage drawing water from the Yellow River, Baoji gorge, Jiaokou,etc are analyzed. Main problems are proposed, providing alterative ways for renovation and modified programmes of large pumping station in Shaanxi Province.
出处
《杨凌职业技术学院学报》
2008年第2期20-24,共5页
Journal of Yangling Vocational & Technical College
关键词
大型泵站
问题
分析
large pumping station
problem
analysis