期刊文献+

基于AHP-Fuzzy的工程建筑设计风险综合评价 被引量:9

Risk evaluation for construction design based on AHP-Fuzzy method
下载PDF
导出
摘要 为综合分析、评价工程建筑设计的技术风险和质量风险,采用专家调查法,全面调查分析了工程建筑设计中会遇到的涉及安全、公共利益等各种风险因素.根据调查结果,采用主观打分法对各风险因素对工程质量安全和工程使用功能的重要程度和风险程度进行了评价.采用AHP方法,计算了各风险因素对工程综合影响的相对重要性权重,并进行了排序.基于AHP评价结果,采用模糊评价法对各风险因素进行了模糊综合评价.综合分析三种评价结果,最终得出建筑设计风险总体上属于中等偏低的水平,并给出建筑设计中各风险因素的重要程度,从而为建筑设计人员提供启示和指导. To comprehensively analyze and evaluate the technical risk and quality risk of construction design, by adopting expert investigating method, all kinds of risk factors encountered in con- struction design concerning safety and public interest were investigated. According to the result of investigation, subject evaluation approach was utilized to evaluate the degree of importance and risk of each risk factor on construction quality safety and using function. By using AHPmethod, the relative importance weight of every risk factor on construction comprehensive influence was calculated and ordered. Based on the evaluation result of AHP, fuzzy comprehensive evaluation on each risk factor was conducted by fuzzy evaluation method. By combining the three evaluation results, ultimately, the conclusion that the overall construction risk is under medium level is drawn and the degree of importance of each factor is proposed, which provides inspiration and guidance for construction designers.
出处 《工程设计学报》 CSCD 北大核心 2008年第4期303-307,312,共6页 Chinese Journal of Engineering Design
基金 山东省建设厅2007年度调研课题
关键词 建筑设计 风险 AHP 模糊评价 construction design risk AHP fuzzy comprehensive evaluation
  • 相关文献

参考文献8

二级参考文献26

  • 1西宝,李一军.复杂工程风险管理的信息密度演化计算方法[J].哈尔滨工业大学学报,2005,37(1):56-59. 被引量:4
  • 2萨蒂TL 许树柏 等.层次分析法在资源分配、管理和冲突分析中的应用[M].北京:煤炭工业出版社,1988..
  • 3秦学志 王雪华 杨得礼.AHP中群组判断的可信度法(Ⅰ)[J].系统工程理论与实践,1997,7(7):10-13.
  • 4[4]黄天民.应用模糊数学[M].成都:西南交通大学出版社,1997.
  • 5[5]Djoen San SANTOSO, Stephen O. OGUNLANA, Takayuki MINATO. Perceptions of Risk Based on Level of Experience for Highrise Building Contractors [ J ]. The International Journal of Construction Management, 2003,3 (3): 49-62.
  • 6[7]Mulholland B, Christian J. Risk Assessment in Construction Schedules[J ], Journal of Construction And Management, 1999, 125(1) :57-61.
  • 7[1]MILLER R,LESSARD D.The Strategic Management of Large Engineering Projects[M].Cambridge,MA:TheMIT Press,2000:21 -23.
  • 8[3]王连芬,许树柏.层次分析法引论[M].北京:中国人民大学出版社,1990:66-87.
  • 9张永波 周可荣 叶永译.FIDIC设计-建造与交钥匙工程合同条件应用指南[K].北京:中国建筑工业出版社,2002.107.
  • 10于守法.投资项目可行性研究指南(试用版)[M].北京:中国电力出版社,2002.78-79.