摘要
针对顶管施工技术在强透水性的强卵砾石层以及地下水丰富,地下水和河床水互补等复杂工程地质情况下的应用,详细介绍了顶管施工方案的选择、施工工艺、流程、施工注意事项以及施工对环境的影响等方面的问题。
Against pipe jacking construction technology in the strong-permeable gravel layer and abundant groundwater, groundwater and river water complementary, and other complex engineering geological circumstances application. This paper describes many problems such as the top choice of the construction plan, construction technology, processes, the construction note and the environmental impact of such issues.
出处
《山西建筑》
2008年第26期159-160,共2页
Shanxi Architecture
关键词
顶管
监控
顶进技术
pipe jacking, monitor, jacking technology