期刊文献+

整体顶升法更换桥梁支座施工控制要点 被引量:8

Control Points for Bridge Bearing Replacement by Integrated Lifting
下载PDF
导出
摘要 采用整体顶升法对不满足使用要求的桥梁支座进行更换,可恢复桥梁的使用性能。介绍了整体顶升法在更换桥梁支座的施工中,对施工准备、拆除约束构造及梁体限位、设置顶升设备、预顶升、更换支座、施工监控等方面进行施工质量控制的要点。 The method of integrated lifting is adopted to replace the bridge bearing not in compliance with the requirements of service, which can recover the performance of bridge for normal service. Introduced hereby are the key points for quality control during construction such as preparatory work, removal of constraint structures and girder limiters, installation of lifting facilities, pre-lifting, bearing replacement and construction supervision.
出处 《中国市政工程》 2008年第1期32-33,共2页 China Municipal Engineering
关键词 桥梁 整体顶升法 支座 施工控制 bridge integrated lifting bearing construction control
  • 相关文献

参考文献4

二级参考文献2

  • 1张之南.血液病诊断及疗效标准[M]科学出版社,1998.
  • 2O. Oymak,H. Demiro?lu,T. Akpolat,Y. Erdem,ü. Yasavul,?. Turgan,?. ?a?lar,S. Dündar,?. Kirazli. Increased erythropoietin response to venesection in erythrocytosic renal transplant patients[J] 1995,International Urology and Nephrology(2):223~227

共引文献522

同被引文献23

引证文献8

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部