摘要
介绍了我国首次进行的750 kV输变电示范工程官东I线1 500 MV·A满负荷条件下工频电场、工频磁场测试情况。测试结果表明,该示范工程工频电场、工频磁场均满足设计指标和国家环保要求。
The power frequency electromagnetic field test conducted firstly in China under 150 MVA full load for Guan-Dong Ⅰ line of 750 kV power transmission & distribution demonstration project is introduced. The test results show that the power frequency electromagnetic field of the project can satisfy the requirements of design index & national environmental protection.
出处
《陕西电力》
2008年第9期27-32,共6页
Shanxi Electric Power
关键词
750
KV
输变电工程
满负荷
工频电场
工频磁场
750 kV power transmission & distribution demonstration project
full load
power frequency electric field
power frequency magnetic field