期刊文献+

工程项目评标模糊综合评判法实证分析 被引量:4

Study on method of fuzzy synthetical evaluation in construction project
下载PDF
导出
摘要 为建立科学、实用和可操作性的评标模型,通过工程实例验证,在分析常用建设工程项目评标方法利弊的基础上,运用模糊综合评判法对非定量的评标因素用隶属度和权重来合理定量分析,以达到对评标结果的公正性、公平性与合法性.模糊综合评判法融合了工程项目评标定性与定量方法的优势,为达到评标初衷提供较为可行的办法,具有较强理论与现实意义. In order to set up the bid-evaluating model which is scientific applied and exercisable, using the fuzzy synthetical evaluation method that is based on analyzing the advantage and disadvantage of construction project evaluation to achieve the fair-and-square and legitimate result. The method of the fuzzy synthetical evaluation in the construction project can achieve the original intention of the bidding-evaluation by integrating the advantage of both qualitative method and quantificational method in construction project.
作者 王平 蔡旭东
出处 《哈尔滨商业大学学报(自然科学版)》 CAS 2008年第5期630-634,640,共6页 Journal of Harbin University of Commerce:Natural Sciences Edition
关键词 建设工程项目 评标方法 模糊综合评判法 实证 分析 building construction bidding-evaluation fuzzy synthetical evaluation demonstration analysis
  • 相关文献

参考文献5

二级参考文献16

共引文献62

同被引文献34

  • 1蔡宁,吴结兵.产业集群的网络式创新能力及其集体学习机制[J].科研管理,2005,26(4):22-28. 被引量:91
  • 2陈惠娥,陈长征.基于神经网络评标方法的建立与应用[J].建筑经济,2006,27(1):56-59. 被引量:6
  • 3Viljamaa K. Technological and cultural challenges in local innovation support activities emerging knowledge interactions in charlotte’s motor sport cluster [J]. European Planning Studies. 2007 ( 9 ) : 1215 - 1232
  • 4Vipin G, Ram S. Seven perspectives on regional clusters and the case of Grand Rapids office furniture city [ J ]. International Business Review. 2008, 17 (4) : 371 - 384.
  • 5Roel R, Frans B. Regional social capital:embeddedness,innovation networks and regional economic development[J].Technological Forecasting and Social Change. 2007,74 ( 9 ) : 1834 - 1846.
  • 6Hemandez M. Innovation in the Mexican manufacturing industry [J].Investigation Economica. 2008 (67) :131 - 136.
  • 7Brenner T, Weigelt N. The evolution of industrial clusters - simulating spatial dynamics [J]. Advances in Complex Systems,2001 (4) :127 -147.
  • 8李龙江.补偿模糊神经网络在埋地燃气管网风险评价失效概率评估中的应用研究[D].贵阳:贵州大学化学工程学院.2006:16-25.
  • 9Baptasta R. Geographical Clusters and innovation diffusion [J]. Technological Forecasting and Social Change ,2001,66( 1 ) :31 -46.
  • 10何博森.国际工程招标与投标[M].北京:水利水电出版社,1994.

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部