基于作业测定技术的后桥壳生产线工艺评价及优化 被引量:1

Evaluation and Optimization on the Technology of the Production Line of Rear Axle House Based on Task Measurement
下载PDF
导出
摘要 以某企业后桥壳生产线为研究对象,运用作业测定技术中的时间研究法,测定后桥壳各工序的标准时间,评价工艺及找到瓶颈工序;运用"5W1H"提问技术,根据"ECRS"原则,同时结合工艺设计及企业资源情况,对后桥壳生产线现有工艺进行评价及优化,改善后,使生产线的产能每天提高了10件,生产能力提高了33.57%。 Aiming at the production line of the rear axle house,this paper applies the time study of work measurement technology to determine the standard time of each working procedure,and evaluates the technology and finds out the bottleneck working procedure.Using the 5W1H checklist,the present technologies adopted in the production line of the rear axle house are evaluated and optimized according to the principle of 'ECRS'(Eliminate,Combine,Rearrange,Simple)and combination of the technology design and the factory's resources.The capacity of the improved new production line can increase 10 pieces each day,and the overall capacity can enhance by 33.57%.
出处 《新技术新工艺》 2008年第10期21-24,共4页 New Technology & New Process
关键词 作业测定 后桥壳 工艺优化 task measurement rear axle house optimization of technology
  • 相关文献

参考文献3

二级参考文献4

共引文献95

同被引文献4

  • 1易树平,郭伏.基础工业工程[M].北京:机械工业出版社,2007.
  • 2李明贤,赖坤裕等.利用评比录影带来讨论影响评比准确度值因素[R].产业管理创新研讨会,2010.
  • 3王爱虎等编译.方法、标准与作业设计[M].北京:清华大学出版社,2007,6.
  • 4郭伏,李森.作业测定技术应用中的问题研究[J].工业工程,2003,6(3):57-60. 被引量:29

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部