积石峡水电站导流隧洞与中孔泄洪洞交叉段开挖支护方法 被引量:1

Excavation and support method for intersection of diversion tunnel and middle outlet tunnel of Jishixia hydropower station
下载PDF
导出
摘要 积石峡水电站导流隧洞和中孔泄洪洞交叉段工程地质条件复杂,处在软硬相间的水平岩层中,且交叉段洞室断面大,两洞室交角小,是积石峡水电站地下洞室开挖施工中的最大难点。交叉段开挖施工措施采用了长台阶、分层分部位、短进尺、多循环的开挖方法,洞室支护措施主要采用锚喷支护加钢支撑的型式,洞室顶部还采用了预应力锚索和高强锚杆进行加固,并喷射钢纤维混凝土,钢支撑与锚索、锚杆之间均采用型钢进行焊联,与围岩形成整体拱效应。积石峡水电站导流隧洞交叉段开挖施工的顺利完成为提前截流提供了条件,争取了施工工期。 The intersection of diversion tunnel and middle outlet tunnel located in the horizontal layers of soft and hard rocks has complicated geological conditions. The tunnel section is big at the intersection, and the intersection angle of the two tunnels is small, which poses the greatest challenge in underground excavation construction of Jishixia hydropower station. The intersection is constructed by the excavation method of long benches, layer by layer and part by part, short advance and more circulation. The tunnels are mainly supported by rock - bolting and steel supports. The tunnel crown is strengthened by pre - stressed anchorage cables and high - strength rock bolts, and steel fiber shotcrete. Section steels are welded between steel supports, anchorage cables and rock bolts, forming integral arch effect together with surrounding rocks. The successful excavation of diversion tunnel intersection creates conditions for river closure ahead of schedule and saves construction period.
出处 《西北水电》 2008年第5期27-30,共4页 Northwest Hydropower
关键词 积石峡水电站 导流隧洞 泄洪洞 水平岩层 交叉段 开挖支护 Jishixia hydropower station diversion tunnel spillway tunnel horizontal strata intersection excavation support
  • 相关文献

参考文献3

  • 1DL/T 5099-1999,水工建筑物地下开挖工程施工技术规范[S].
  • 2DL/T5181-2003,水电水利工程锚喷支护施工规范[S].
  • 3DL/T 5195-2004,水工隧洞设计规范[S].

共引文献87

同被引文献10

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部