摘要 对于大型抽水蓄能电站来说,首机起动方式是一个综合性的技术经济研究课题。根据电站自身的特点选取不同的起动方式,对于缩短电站建设工期以及节省投资均有较大帮助。在对国内、国外抽水蓄能电站起动方式进行了总结的基础上,对两种起动方式从技术以及经济方面作了初步分析,为今后抽水蓄电站能机组起动方式的选择提供一些参考。 The starting-up mode for the first generating unit of large-sized pumped storage power station is a comprehensive technical and economic research subject. A proper starting-up mode which suits the actual situations and characteristics of station is great helpful to reduce construction period and investment of the project. Based on the experiences of the starting-up mode of the first generating unit of the pumped storage power station at home and abroad, this paper gives preliminary analysis on two different starting-up modes from the aspects of technology and economy, which can be used for reference in the selection of the starting-up mode of the generating unit of pumped storage power station in the future.
出处 《水力发电》 北大核心 2008年第10期63-66,83,共5页 Water Power
关键词 水泵工况 水轮机工况 首机起动方式 抽水蓄能电站 working condition of pump working condition of turbine starting-up mode of the first unit pumped storage power station
  • 相关文献

同被引文献48

引证文献7

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部