期刊文献+

开发建设项目水土保持方案有关技术问题探讨 被引量:1

Probe into Several Technique Problems About Soil and Water Conservation Plan for Exploitation and Construction Projects
下载PDF
导出
摘要 随着我国水土保持法律法规体系的不断完善和执法力度的加大,开发建设项目水土保持方案的编制工作日趋繁重.为了保证水保方案编制的质量,国家实行了资质证书制度,并制定了方案审批、监督实施的具体办法,使开发建设项目造成的水土流失逐步得到科学合理的治理.与此同时,由于开发建设项目工程类别多,造成的水土流失特点各异,以往遵循的水土保持各类标准和规范不适应新的情况,而编制开发建设项目水保方案的技术规范还未颁布,在当前的水保方案编制过程中遇到了许多新的技术问题,这些技术问题若解决不当势必影响水保方案的编制及水土流失的防治工作.本文根据近几年编制各类建设项目水保方案的实践,就有关问题与大家商讨,以期提高水保方案编制质量.1 Soil loss caused by exploitation and construction projects has characteristics incompleteness of region, imbalance of process and variance and potentiality of harm, etc. When drowning up soil and water conservation plan, we should consider its sole prevention goal, definiteness and high standard of prevention measures, meanwhile we also should consider temporary and mandatory implementation of soil and water conservation plan. Flood prevention standard of engineering project in the soil and water conservation plan for construction project should be determined in the light of designed service life of construction project, but the standard is usually higher in order to meet the demand of security of production. The service life of soil and water conservation plan for once construction project should e-qual to the construction period of principal part of the project, the service life of soil and water conservation plan for resource exploitation project should not exceed 20 years. The investment of the soil and water conservation plan for construction project should be calculated according to national standard of budgetary estimation for fundamental construction.
作者 姜德文
出处 《中国水土保持》 1997年第5期39-41,共3页 Soil and Water Conservation in China
关键词 建设项目 水土保持方案 开发 编制 exploitation and construction project soil and water conservation plan technology standard
  • 相关文献

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部