摘要
针对当前国内资源非常短缺的情况,毅腾矿业有限公司大力开拓进口蒙古国煤炭以满足国内需求。为此,毅腾公司将建设一条400万t的洗煤厂,并进行可行性研究。
In the face of resource shortage, Tengchong mining Co. , Ltd enters on importing coal from Mongolia in order to satisfy the great domestic demand in coal. They will build another 4Mt/a coal prepare plant, and the feasibility study report was brought forward to.
出处
《中国矿业》
北大核心
2008年第10期102-105,108,共5页
China Mining Magazine