摘要
该文介绍了上海汽轮机厂生产的引进型300MW汽轮机组的热力性能试验情况,对试验的热耗率和出力作了分析说明,并对有关试验的不确定度作了说明。
The paper describes the thermal acceptance test of a licensed 300MW steam turbine set manufactured by Shanghai Steam Turbine Works,expllains and analyzes the test heat rate together with a comment on its uncertainty.
出处
《发电设备》
1997年第2期6-9,共4页
Power Equipment