期刊文献+

超长预应力混凝土结构后浇带设计新方法 被引量:4

METHOD FOR DESIGNING NON-PRESTRESSED POST-POURED STRIPS OF PRESTRESSED CONCRETE STRUCTURES WITH LARGE LONGITUDINAL LENGTH
下载PDF
导出
摘要 探讨超长预应力混凝土结构预应力后浇带常用设计方法,指出其不足之处。对允许出现限值裂缝的超长预应力混凝土结构提出非预应力后浇带设计方法,并通过理论分析和算例验证了此法的可行性。 Design methods currently dealing with prestressed post-poured strips of prestressed concrete structures with large longitudinal length are discussed and problems are put forward. A new method that designing post-poured strips by using only reinforcements is brought forward for prestressed concrete structures with large longitudinal length, for which finite crack width is permitted. The method is proved applicable through theoretical analysis and exemplificative verification, so it is worth consulting.
出处 《建筑技术》 北大核心 2008年第12期947-950,共4页 Architecture Technology
关键词 预应力后浇带 非预应力后浇带 温度收缩应力 prestressed post-poured strip non-prestressed post-poured strip temperature and shrinkage stress
  • 相关文献

参考文献4

二级参考文献9

共引文献29

同被引文献12

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部