摘要
介绍了马钢两台300 m2烧结机系统冷却机(2×336 m2)余热发电系统的构成及投运情况。该项目已于2005年9月完工,本文总结了两年多的生产运行所取得了的经验,分析了在工艺设计和生产操作两方面所暴露出的一些问题,并提出了解决办法。
The composition of waste heat power generation system and its put into production of sinter coolers (2 × 336 m^2) in MAGANG 2 ×300 m^2 sintering system were introduced. This power generation project was completed in September 2005, some experience gained during over tow years operation and some problems revealed were summarized in this paper. At last, the measures for solve above problems were proposed by the auther.
出处
《烧结球团》
北大核心
2008年第6期7-10,共4页
Sintering and Pelletizing
关键词
烧结
烧结带冷机
余热发电系统
sintering,sinter straight cooler, waste heat power generation system