摘要
文章主要介绍了韶关冶炼厂30万t挖潜技术改造中Ⅰ、Ⅱ系统铅锌密闭鼓风炉系统改造情况,并对改造后效果进行对比分析,为今后鼓风炉改造提供一定参考。
The 300 000 tons potential technical improvement of closed - top ])last furnace in Shaoguan Smelter Ⅰ anti Ⅱ system is introduced in this paper, the improvement result is eomparied anti analyzed, so it offers reference for the closed- top blast furnace improvement in the future.
出处
《湖南有色金属》
CAS
2008年第6期27-30,66,共5页
Hunan Nonferrous Metals
关键词
密闭鼓风炉
喷淋炉壳
技术改造
效果
closed - top blast furnace
shower - cooling casing
technical improvement
result