期刊文献+

基于广州抽水蓄能厂机组全停的电网调度运行策略分析 被引量:4

Analysis on the Grid Dispatching Operation Strategy based on All-outage of Guangzhou Pumping-up Power Plant
下载PDF
导出
摘要 广州抽水蓄能厂机组全停将极大威胁电网的安全稳定运行,同时也给调度实时运行带来很大困难。就此,分析了在广州蓄能厂机组全停下的广东电网调度运行策略,提出相应的调峰调频策略,对电网调度实际运行有一定指导意义。 The outage of Guangzhou Pumping-up Power Plant will affect the operation reliability of power grid and decrease the electric power quality and bring great difficulty to dispatcher's operation and power system configurations. The operation strategy for Guangdong Power Grid during the outage of Guangzhou Pumping-up Power Plant is analyzed. Then some corresponding strategies of peak load and frequency regulation are proposed for actual power grid dispatching.
出处 《南方电网技术》 2008年第5期10-13,共4页 Southern Power System Technology
关键词 抽水蓄能 调峰调频 运行策略 事故预案 Guangzhou Pumping-up Power Plant operation strategy accident's beforehand case peak load and frequency regulation
  • 相关文献

参考文献4

二级参考文献37

共引文献51

同被引文献32

引证文献4

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部