摘要
针对河北国华沧东发电有限公司1号、2号机组凝结水溶解氧量超标的问题进行了分析,提出了具体的解决方案并实施,改造后凝结水溶解氧均降到了合格范围内,为机组的安全经济运行提供了可靠保证。
In accordance to over standard of condensate water dissolved oxygen power unit, this paper raises material settlements, and put into actualization. After reformation, condensate water dissolved oxygen decreased to the eligible range, so as to offer guarantee to safe and economic operation of unit.
出处
《河北电力技术》
2008年第B09期48-50,共3页
Hebei Electric Power
关键词
火电机组
凝结水
溶解氧
化学监督
凝汽器
thermal power unit
condensate water dissolved oxygen
chemical supervision
condenser