期刊文献+

14层办公楼定向爆破拆除 被引量:5

DIRECTIONAL BLASTING DEMOLITION OF 14-STOREY OFFICE BUILDING
下载PDF
导出
摘要 待爆破拆除的14层办公楼为框架结构,南北长29m、东西宽19m,最高处为46.2m,总建筑面积6000m^2。施工过程中采用支撑轴前移的方法,有效地控制了楼体后坐。由于设计了合理的爆破参数,采取了有效的安全防护措施,使爆破拆除达到了预期效果。 Towering 46.2 m at its highest point and covering a construction area of 6000 square meters, the building to be demolished was a 14-storey office building in frame structure with a length of 29 m from north to south and a width of 19 m from east and west. Backlashing phenomenon was effectively controlled by using the method of forwarding back shaft in blasting operation. Thanking to the reasonable blasting parameters cooperated with the safety protection measures, the demolition saw an ideal blasting effect.
出处 《工程爆破》 2008年第4期43-45,共3页 Engineering Blasting
关键词 框架结构 定向爆破 后坐 支撑轴前移 安全防护 Frame structure Directional blasting Backlashing phenomenon Back shaft-forwarding Safety protection
  • 相关文献

参考文献4

二级参考文献13

共引文献28

同被引文献48

引证文献5

二级引证文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部