摘要
以鞍山钢铁集团公司300 MW燃气—蒸汽联合循环机组为例,阐述了性能验收试验的标准、试验方法和测量仪表,重点介绍了计算过程,并给出了试验结果,指出了试验中需重点注意的问题。
This paper discusses the standard, solution and measuring instruments, taking 300 MW gas-steam combined cycle unit in Anshan Steel Corporation as an example. It focuses on the computing process and the results, pointing out the cautions in the test.
出处
《东北电力技术》
2008年第12期1-5,共5页
Northeast Electric Power Technology
关键词
联合循环
热力性能
验收试验
计算方法
Combined Cycle
Thermal performance
Checkup test
Computing method