摘要
通过对南翼204外运256m巷道坡度情况的调查和分析,提出了对原巷道宽度和坡度进行改造,对运输系统进行了技术创新使超过16°上山的皮带运输成为了可能,填补了皮带运输的国内外空白。
By investigation and analysis to 204 paragraph of south face outsides trasportation tunnel 256 meters of tunnel spope condition,reform having hrought forward face to face original tunnel width and. slope being in progress,having carried out technologieal innovation on to transporting system makes to exceed the belt going up the hill 160 meters transporting the home and abroad blank space having become possibility ,haviag filled in the in the bomelsnd belt conveyer.
出处
《山东煤炭科技》
2008年第6期149-149,151,共2页
Shandong Coal Science and Technology
关键词
皮带运输机
大坡度
运输煤炭
试验
The belt converyer big slope transport coal the expeciment