摘要
通过对钢筋混凝土结构的分析,阐述了在钢筋混凝土结构中,如何才能设置有效的后浇带,并控制好施工期内的温度收缩。
Through analysing reinforced concrete structure, how to set post - pouring belt in construction was introduced in this paper. It is important to control temperature contraction.