摘要
平顶山煤业集团十一矿针对急倾斜煤层综采设备的安装,提出了最佳施工方案,有效地缩短了工期,实现了安全生产,取得了较好的效果,值得推广和应用。
Aimming at installation of full- mechanized coal mining equipments, the best construction project is proposed. The construction period is shortened. The safe production is realized. The beter effect is obtained. It' s worthy of promotion and application.
出处
《煤炭技术》
CAS
北大核心
2009年第1期59-60,共2页
Coal Technology
关键词
急倾斜煤层
综采设备
安装
steep coal seam
fully - mechanized coal mining equipment
installation