期刊文献+

武广客运专线32m箱梁预应力效果监测及徐变上拱的控制措施 被引量:7

The 32 m span box girder prestressing effect monitoring and creep camber control for Wuhan-Guangzhou passenger express line
下载PDF
导出
摘要 采用现场实测的方法对武广客运专线工程32 m预应力混凝土箱梁应力效果进行监测,并采用Mi-das/Civil结构分析程序进行了弹性上拱的理论分析,提出箱梁徐变上拱的控制措施,为同类工程提供借鉴及经验。 As a case for study, the online montoring and numerical analysis for 32 m concrete prestressed box girder prestressing and elastic camber effect in Wuhan-Guangzhou passenger express line was performed in the paper. The effect of monitoring and analysis, based girder creep camber were put forward, which can be projects. on the engineering practice, the control measures of the box taken as a reference and experience guidance for the similar
作者 宋津喜
出处 《中国工程科学》 2009年第1期60-66,共7页 Strategic Study of CAE
关键词 武广客运专线 32 m箱梁 预应力效果监测 徐变上拱控制 Wuhan-Guangzhou passenger express line 32 m box girder prestressing effect monitoring creep camber control
  • 相关文献

参考文献3

二级参考文献9

  • 1孔德艳.预应力混凝土简支梁徐变上拱的控制研究[D].兰州:兰州交通大学,2005.
  • 2TZ210-2005铁路混凝土工程施工技术指南[S].北京:中国铁道出版社,2005.
  • 3铁科技[2005]101号文.客运专线高性能混凝土暂行技术条件[M].北京:中国铁道出版社,2005.
  • 4TZ213-2005客运专线铁路桥涵工程施工技术指南[S].北京:中国铁道出版社,2005.
  • 5铁科技[2004]120号文.客运专线预应力混凝土预制梁暂行技术条件[M].北京:中国铁道出版社,2004.
  • 6中华人民共和国铁道部.TBJ 2-85铁路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:中国铁道出版社,1985.
  • 7中华人民共和国铁道部.TB 10002.3-2005铁路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:中国铁道出版社,2005.
  • 8CEB欧洲国际混凝土委员会.CEB-FIP1990模式规范(混凝土结构)[S].中国建筑科学研究院结构所规范室译.北京:中国建筑工业出版社,1991.
  • 9Bazant Z P, Panula L. Practical Prediction of Time-dependent Deformation of Concrete (PartsI-VI)[J]. ACI Materials and Structures, 1978,94 (1) : 267-281.

共引文献20

同被引文献47

引证文献7

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部