期刊文献+

南京长江三桥钢索塔现场拼装测量的关键技术 被引量:3

Technology of the steel-pylon's process assembling survey of Nanjing Third Yangzi River Bridge
下载PDF
导出
摘要 南京长江三桥是我国首座主塔采用钢结构形式的特大型桥梁。针对钢索塔施工的特点,研究了长江三桥钢索塔现场拼装测量的关键技术,分析了钢索塔拼装测量专用控制网的建立方法,提出内控法和内外控相结合的拼装测量方法,并对钢索塔的拼装测量结果进行质量评定。结果表明,钢索塔的各项竣工数据指标均满足设计要求。 Nanjing Third Yangzi River Bridge was the first cable-stayed bridge in China. Its main tower was the form of steel structure. The key technology of the steel-pylon' s process assembling was investigated to meet the characteristics of the steel-pylon' s construction. The method of the control network' s building for assembling survey was introduced. The inner controlling method and the method combined inner controlling and outer controlling were pointed out. Quality evaluation was made for the assembling surveys' s result. The results showed that the survey methods could meet the requirement of design and construction: It could also be a reference for the similar steel-pylon' s engineering projectors.
出处 《南京林业大学学报(自然科学版)》 CAS CSCD 北大核心 2009年第1期101-105,共5页 Journal of Nanjing Forestry University:Natural Sciences Edition
基金 江苏省高校自然科学基金资助项目(06KJD610081)
关键词 南京长江三桥 钢索塔 拼装测量 垂直度 Nanjing Third Yangzi River Bridge steel-pylon assembling survey verticality
  • 相关文献

参考文献7

二级参考文献21

共引文献38

同被引文献20

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部